£6m redevelopment update

It’s the dawn of a new era for Harrogate College, as the £6m campus redevelopment project, part funded by the York, North Yorkshire and East Riding LEP, starts to really take shape.
Social media


Technology Centre

The project will see brand new industry standard facilities opening for new and returning students in September 2016, including the build of the Technology Centre that will house the motor vehicle workshops, electrical, joinery and construction trades.

Planning Stage_Vocational

 

February 2016 - A birds eye view of the Technical Centre. What a size!
February 2016 – A birds eye view of the Technical Centre. What a size!
Tech centre
Technology Centre, May 2016

Bistro on the Park / Image Academy Hair and Beauty Salons / HG2 Café

The front of the main building (currently named A Block) which faces Hornbeam Park will have a ‘high street’ feel to it, with the industry standard training kitchens, restaurant, student refectory and the hair salon all open to the public.

Guests will be able to enjoy fabulous food cooked by our Catering and Hospitality students, in our restaurant but also to take away or to cook at home. The kitchens will provide the perfect environment for small start up businesses to use for research and development, to get their ideas off the ground.


Hair & Beauty Salons

Our campus hair and beauty salons will reflect industry standards and be open to the public, offering fantastic rates for treatments and hair cuts. For a special treat, you could enjoy a pamper day in our salons with a tasty lunch created by our Catering and Hospitality students, included.

Harrogate College New General Photos 4th December 2013 41


Art & Design

Our thriving Art & Design department is the first to move into the new facilities in our consolidated campus. The current provision is based in Harrogate College B Block, but will take up it’s new home on the top floor of A Block, where the students will enjoy stunning views of the rolling countryside and a light, airy and spacious working environment.

Art classroom
One new art and design classroom- pre furniture

New reception area

The first area to be completed was the reception, after having a face lift! New shutters have been installed, partition walls have been removed and such much extra space has been created. Check out what’s happened here.


You can also read about how the catering students baked for the builders here.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s